Quality & Certifications
How we control quality batch by batch — and how we handle the certificates and test reports your market asks for.
Certificates & approvals
Original documents held in the name of Jiangmen CNCT Co., Ltd. The full report behind any certificate is sent with our quotation on request.
ISO 14001:2015 — Environmental ManagementEACC · Certificate No. USA23E43337R0SEnvironmental management system covering the production of sheet metal parts and related site activities.
DX51D+Z Galvanised Steel — Mill CertificatePanhua Group · Certificate ID DX25-0149Material quality certificate for hot-dip galvanised steel coil DX51D+Z: chemical composition and mechanical test results recorded per coil batch.Material control
Steel sheet is checked for thickness and coating on receipt, and mill certificates are filed against the production batch.
In-process inspection
Dimensions, bend angles and weld integrity are measured against the approved sample at defined points on the line.
Pre-shipment check
Assembly trial, finish inspection and packing verification before the goods are released to the loading bay.
Records and documents
Measurement records and QC photos travel with the shipment; documents are prepared for your customs broker.
Documents we issue per order
Beyond the certificates above, shipment paperwork is prepared for each order — different markets need different documents.
Inspection records
Dimension reports and QC photo sets for the batch you ordered, shared before loading.
Compliance marks
Tell us which marks your market requires — EN 13724 for letterboxes is the most common request — and we confirm availability during quotation.
Warranty
Welded structures carry a 3-year warranty against manufacturing defects, honoured through replacement parts or credit.
Your inspector is welcome on the floor
Many of our buyers use SGS, BV or their own agent for pre-shipment inspection. We plan production so the inspection can happen on schedule, and share measurement data in advance so issues are caught early.
- Inspection dates scheduled with your agent before production starts
- Measurement data and QC photos shared ahead of the visit
- Non-conforming batches reworked or remade before loading
